Play area A sign stipulating ‘do’s and don’ts’ was needed before the playground could be opened. This should be ready in about two weeks time. ROSPA required that the play area be monitored for damage and hazards to children.
Trim trail The lottery fund bid had failed. It was agreed that, given the number of failed bids for the trim trail, the best way forward now was to do-it-ourselves with community involvement. Two promises of £1000 towards the bridge over the stream have been received.
It was agreed that a boule pit should be included as requested by the twinning club and that a path should be kept clear on the far side of the stream.